FPM Extent of Flooding (DWER-017)

The Department of Water and Environmental Regulation produces floodplain mapping of rivers and major watercourses and provides floodplain development advice to ensure that proposed floodplain development has adequate flood protection and does not impact on the existing flood regime of the area.

This advice is related to major river flooding only. Other issues, such as stormwater drainage and envirionmental and ecological considerations are not addressed.

This dataset contains 20 lines are as follows:

Extent of 1 in 10 (10%) AEP flooding Extent of 1 in 20 (5%) AEP flooding Extent of 1 in 25 (4%) AEP flooding Extent of 1 in 50 (2%) AEP flooding Extent of 1 in 100 (1%) AEP flooding Extent of flooding - Designated flood event Extent of 1 in 200 (0.5%) AEP flooding Extent of 1 in 500 (0.2%) AEP flooding Extent of maximum channel capacity Extent of probable maximum flooding Extent of study - 1 in 10 (10%) AEP Extent of study - 1 in 20 (5%) AEP Extent of study - 1 in 25 (4%) AEP Extent of study - 1 in 50 (2%) AEP Extent of study - 1 in 100 (1%) AEP Extent of study - Designated flood event Extent of study - 1 in 200 (0.5%) AEP Extent of study - 1 in 500 (0.2%) AEP Extent of study - Maximum channel capacity Extent of study - Probable maximum flood

The Extent of Flooding lines are boundaries defining the expected location flooding would reach during a particular flood event (e.g. 1 in 100 (1%) AEP, etc.).

Note: To see the full scope of the floodplain mapping, 12 dataset layers are required to be loaded in the following order:

FLOODPLAIN DATASET LAYERS:
FPM Flood Level Points (m AHD) FPM Flood Level Contours (m AHD) FPM 1 in 100 (1%) AEP Floodway and Flood Fringe Line FPM Extent of Flooding FPM Levee Banks FPM Location of Cross Sections FPM 1 in 100 (1%) AEP Floodplain Development Control Area FPM Map Index FPM Bridges FPM Special Development Condition Area FPM 1 in 100 (1%) AEP Floodway and Flood Fringe Area FPM Floodplain Area

The dataset covers the following areas:

  • Avon River - Toodyay to Beverley.

  • Blackwood River – Augusta, Bridgetown, Nannup and Boyup Brook Townsites.

  • Bow River - Bow Bridge Townsite.

  • Capel River - Capel Townsite.

  • Chapman River – Geraldton Townsite.

  • Coblinine River & Dorderyemunning Creek - Wagin Townsite.

  • Collie River - Collie Townsite.

  • Denmark River - Denmark Townsite.

  • Fitzroy River - Fitzroy Crossing Townsite.

  • Five Mile Brook - Bunbury Townsite.

  • Gascoyne River - Carnarvon Townsite and the Lower Gascoyne (contains both pre and post-stage 2 Carnarvon flood mitigation works mapping: refer to "COMMENTS" field).

  • Greenough River – Indian Ocean to Walkaway.

  • Gribble Creek - Kalgoorlie Townsite.

  • Harding River - Roebourne Townsite.

  • Irwin River - Dongara Townsite.

  • Margaret River – Margaret River Townsite.

  • Nullagine River – Nullagine Townsite.

  • Preston River - Boyanup and Donnybrook Townsites.

  • Serpentine River, Murray River and the Peel Inlet / Harvey Estuary - Peel Inlet / Harvey Estuary to Pinjarra and south to the Darling Scarp (Murray River) and Peel Inlet / Harvey Estuary to Wellard and east to South Western Highway (Serpentine River).

  • Swan River, Canning River and Tributaries: Fremantle to Walyunga National Park (Swan River) and Canning Bridge to Brookton Highway (Canning River). Tributaries include Bennett Brook, Blackadder Creek, Ellen Brook, Helena River, Jane Brook, St Leonards Creek, Susannah Brook (Swan River) and Southern River/ Wungong Brook (Canning River).

  • Toby Inlet – Quindalup Townsite.

  • Turkey creek - Warmun Aboriginal Community.

  • Vasse-Wonnerup Estuaries, Broadwater and New River - Busselton Townsite.

  • Wagin Townsite.

  • Willyung Creek – Albany Townsite.

  • Yakamia Creek – Albany Townsite.

The dataset also covers the following areas: However these are not design flood events, they are major historical or alternative scenario flood events that have been used (instead of the design flow, if present) to set planning & development guidelines as part of the floodplain management strategy. Refer to "FPM Historical Extent of Flooding" metadata for more details.

  • Cohn Creek - Merredin Townsite.

  • Corrigin Townsite.

  • Gordon River - Tambellup Townsite.

  • Turkey Creek - Warmun Aboriginal Community (contains both design and historical information).

  • Yakamia Creek – Albany Townsite (contains both design and alternative scenario information).

Glossary:

  • Annual exceedance probability (AEP) - the likelihood of occurance of a flood of a given size or larger in any one year; usually expressed as a percentage.

  • 1 in 100 AEP flood - this means that there is a 1 in 100 (or 1%) chance of a flow of this size or larger occurring in any one year. This flood has a 50% chance of being experienced at least once in a person's life time. The 1 in 100 AEP flood has been generally adopted in Australia and overseas as the basis for floodplain management planning.

  • Floodplain - the portion of a river valley next to the river channel which is civered with water when the rier overflows its banks during major river flows. The term also applies to land adjacent to estauries which is subject to flooding.

  • Designated flood event (DFE) - used for planning purposes and is generally the 1 in 100 (1%) AEP "designed" flood event. However, a designated flood event could be based on an "actual" flood event (e.g. Moora 1999 flood event) or an alternative scenario (i.e. Yakamia Creek - 1 in 100 (1%) AEP flood event plus sea level rise).

  • Maximum channel capacity (MCC) - the maximum flow that a waterway can contain before breaking out across the floodplain during a flood event.

  • Probable maximum flood (PMF) - the largest flood that could conceivably occur at a particular location, resulting from probable maximum precipitation. The PMF defines the extent of flood-prone land. Generally, it is not physically or financially possible to provide general protection against this event.

  • Australian Height Datum (AHD) - is a geodetic datum for altitude measurement in Australia. It was adopted in 1971 by the National Mapping Council as the datum to which all vertical control for mapping is to be referred. The datum is based on the mean sea level (1966-1968) being assigned the value 0.000m on the Australian Height Datum (AHD) at 30 tide gauges around the coast of the Australian continent.

This dataset was formally known as FPM Extent of Flooding (DOW-055)

Data and Resources

Additional Info

Field Value
Access Level
Data Access Statement
Access URL
Data Portal
Data Homepage https://services.slip.wa.gov.au/public/rest/services/SLIP_Public_Services/Water/MapServer/8
Author Department of Water and Environmental Regulation
Maintainer Department of Water and Environmental Regulation
Theme Environment
Geospatial Theme Water
Published on 2016-01-28
Data last updated on 2018-06-19
Update Frequency infrequently
Temporal coverage from
Temporal coverage to
Digital Object Identifier
Citation
Geospatial Source Projection
Geospatial Coverage

Dataset extent

Map data © OpenStreetMap contributors
Tiles by MapBox
comments powered by Disqus